balticwind.eu
Actions
Media Outlet details
| Scope | N/A |
|---|---|
| Language | English |
| Country | Estonia |
|
Similarweb UVM |
Request pricing |
|
Comscore UVM |
Request pricing |
Recent Articles
Search ArticlesDanish machining firm CNC Onsite opens Houston subsidiary to sell crane-free turbine repairs in the US
CNC Onsite, a Vejle-based specialist in mobile precision machining for wind turbines, is opening its first foreign subsidiary in Houston, Texas. The company said on 16 September that CNC Onsite Inc. has already completed its first repair jobs and will offer uptower yaw ring, shaft and blade root repairs to wind farm operators across the United States without the use of heavy cranes. The pitch rests on the cost of crane logistics.
Sweden’s wind politics in one picture: a tax cut everyone backs, permits that still take years, and a cable to Denmark on ice
Sweden went into its September general election with an unusual alignment on energy: nearly every party in the Riksdag wanted a lower electricity tax, the industry and the government inquiry agreed on shortening permit appeals, and the grid operator had just said the country needs to add fossil-free generation at a pace it has never managed before. Set against that consensus is one sharp dissent, the government’s decision to freeze the Konti-Skan cable upgrade to Denmark in a row with Brussels.
Nordex wins 91 MW order from TEUT for 13-turbine Schönermark-Passow wind farm in Brandenburg
Nordex Group has received an order from Berlin-based developer TEUT Energieprojekte for 13 N163/6.X turbines totalling 91 MW at the Schönermark-Passow wind farm near Schwedt/Oder in Brandenburg’s Uckermark district. The Hamburg-based manufacturer announced the contract on 16 September; it includes a 20-year premium service agreement.
Ørsted chief Rasmus Errboe takes over as WindEurope chair, with Enel Green Power’s Bernabei as vice-chair
The WindEurope board has elected Ørsted chief executive Rasmus Errboe as its new chair and Enel Green Power chief executive Salvatore Bernabei as vice-chair. Their 18-month term began on 16 September 2026. Errboe succeeds Vestas chief executive Henrik Andersen, whom the association thanked for his leadership during his tenure. The handover comes in a year the industry body expects to be a record one.
Energiequelle commissions 4.26 MW Enercon turbine at Danna, densifying the Feldheim wind farm
Energiequelle GmbH has commissioned a new wind turbine at Danna in Brandenburg, expanding the neighbouring Feldheim wind farm. The Enercon E-138 EP3 E3 machine has a rated capacity of 4.26 MW and a hub height of 160 metres. The turbine is expected to generate around 9,000 MWh a year, which the company says corresponds to the annual consumption of roughly 2,600 to 2,700 three-person households.
Berlin start-up scopea combines wind measurement and independent expert assessments, launching at WindEnergy Hamburg
A new service company has entered the German wind sector. scopea GmbH, based in Berlin, brings together measurement technology, operational analysis and technical optimisation with independent expert assessments for wind energy projects. The company will formally launch at WindEnergy Hamburg 2026. scopea aims to serve project developers, operators, investors and lenders across the life cycle of a wind farm.
EU wind research project MERIDIONAL spins off Ventoplani, a start-up selling tethered ‘windplanes’ for homes and off-grid sites
The Horizon Europe research project MERIDIONAL, which has spent four years studying the physics of wind and its effect on onshore, offshore and airborne wind energy systems, is closing with a commercial spin-off. Ventoplani, an Italian start-up founded by researchers at Politecnico di Milano, is bringing small-scale airborne wind energy devices, which it calls windplanes, to homes, businesses and off-grid locations.
Lithuania’s renewables build-out: how Ignitis, Klaipėda and a prosumer boom took the country towards 7 GW
Lithuania has gone from energy importer to one of the fastest-moving renewable markets in the Baltic region in the space of a few years. Installed renewable capacity reached 6.5 GW in mid-2026 and is expected to pass 7 GW by year-end, according to figures published by the energy ministry.
Deutsche WindGuard adds AI assistant wonBOT to its WONDER asset management platform
Deutsche WindGuard Systems GmbH, the Berlin-based software arm of the Deutsche WindGuard group, has added an AI-based digital assistant called wonBOT to its wind farm asset management system WONDER. Users can ask questions in natural language inside the platform and receive operational information on their renewable energy portfolio in real time, without navigating through menus and reports. The assistant answers specific questions on portfolios, individual turbines and master data.
Who installs the Baltic’s turbines: the vessel fleet behind the build-out, from jack-ups to Poland’s first cable-layer
Every offshore wind farm in the Baltic is built by a small, expensive and heavily booked fleet of specialist ships. Turbines and foundations are getting bigger faster than the vessels that carry them, which is why the ships, not the turbines, have become one of the tightest constraints on the region’s build-out. This explainer sets out what the fleet consists of, who owns it, and where the Baltic’s own capacity is starting to appear. The central vessel type is the jack-up installation ship.