Abstract In O-cell pile load tests conducted at high-fill mine spoil-dump sites, testing is often terminated before the pile reaches its ultimate bearing state owing to the loading-capacity limitation of the O-cell and the requirement to avoid destructive loading of engineering piles, making it difficult to directly determine the ultimate vertical bearing capacity of the pile.
Is this you? As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.
Claim your profile