On September 24, 2026, the U.S. Department of Energy (“DOE”) announced the 31 transmission projects it plans to fund through the Speed to Power through Accelerated Reconductoring and Other Key Advanced Transmission Technology Upgrades (“SPARK”) program. The projects will receive $5.25 billion in total, consisting of $1.9 billion in federal funding and $3.35 billion through recipient cost-share funding.
Is this you? As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.
Claim your profile
Articles by Jill Drum
DOE Awards $1.9 Billion in SPARK Funding for Grid Modernization Projects | JD Supra
[author: Adam Webster] On September 24, 2026, the U.S. Department of Energy ("DOE") announced the 31 transmission projects it plans to fund through the Speed to Power through Accelerated Reconductoring and Other Key Advanced Transmission Technology Upgrades ("SPARK") program. The projects will receive $5.25 billion in total, consisting of $1.9 billion in federal funding and $3.35 billion through recipient cost-share funding.
FERC Approves NYISO Capacity Market Revisions to Address Seasonal Reliability Risks | JD Supra
On June 26, 2026, FERC accepted New York Independent System Operator, Inc.'s (NYISO) proposal to modify its Installed Capacity market rules to address seasonal reliability risks and to account for seasonal availability of capacity supply. In doing so, FERC found that the revisions will enhance NYISO's ability to send appropriate price signals through the Installed Capacity market, which will ensure sufficient capacity during winter periods. The revisions were accepted effective June 28, 2026.
FERC Approves ISO-NE Updated Market Rules for Distributed Energy Resources
On May 29, 2026, FERC approved revisions to the ISO New England, Inc.’s (ISO-NE) proposed market rules for the participation of Distributed Energy Resources (DERs) and to implement a one-time extension to the period in which resources are required to resume commercial operation following a forced outage.
FERC Orders American Efficient to Pay $1.1 Billion for Alleged Capacity Market Fraud
On April 16, 2026, FERC issued a civil penalty assessment order, directing American Efficient and affiliated companies (together, American Efficient or Company) to pay $1.1 billion in disgorgement and civil penalties for what FERC called “one of the largest and most brazen frauds in the history of the [] Commission.”[1] The Assessment Order was issued following an investigation by FERC’s Office of Enforcement and Regulatory Accounting (Enforcement), and a public Order to Show Cause proceeding...
FERC Dismisses BGE Complaint Against Transco Challenging Negotiated Rate Below Recourse Rate | JD Supra
On February 19, 2026, FERC dismissed a complaint filed by Baltimore Gas and Electric Company (BGE) against Transcontinental Gas Pipe Line Company, LLC (Transco) asserting that BGE had a contractual right to challenge its negotiated rate with Transco pursuant to section 5 of the Natural Gas Act (NGA). FERC held that BGE contractually waived its NGA section 5 rights with respect to its negotiated rate, and BGE therefore was required to pay the negotiated rate.
FERC Accepts SPP’s Large Load Interconnection Process | JD Supra
On January 14, 2026, FERC accepted the Southwest Power Pool, Inc.’s (SPP) revisions to its Open Access Transmission Tariff (Tariff) to create a High Impact Large Load (HILL) study process and High Impact Large Load Generation Assessment (HILLGA) process. The HILL study process establishes study and operational requirements for HILLs connecting to SPP’s transmission system.
FERC Orders PJM to Establish Terms and Conditions in its Tariff for Co-Location Arrangements | JD Supra
On December 18, 2025, FERC directed PJM Interconnection, L.L.C. (“PJM”) to revise its Open Access Transmission Tariff (“Tariff”) to: 1) establish terms that an Interconnection Customer seeking to serve co-located load must follow when effectuating a co-location arrangement; 2) clarify the scope and potential of interconnection service when interconnecting new generation to serve co-located load; and 3) require that a customer taking transmission service on behalf of co-located load take one...
FERC Accepts MISO’s Revised Demand Resource Real Power Testing Requirements | JD Supra
On November 17, 2025, FERC accepted the Midcontinent Independent System Operator, Inc.’s (MISO) proposed revisions to its Open Access Transmission Tariff (OATT) to modify real power testing requirements for Demand Resources. MISO specifically proposed more stringent requirements for Demand Resources seeking waiver of performing real power tests and real power tests for Demand Resources using a firm service level baseline.
Court Denies Injunction Seeking to Halt FERC Enforcement Proceedings | JD Supra
On November 24, 2025, the U.S. District Court for the Middle District of North Carolina denied American Efficient LLC’s (American Efficient) preliminary injunction seeking to halt FERC’s civil enforcement proceedings for alleged market manipulation and tariff violations. American Efficient argued that FERC’s process violated the Seventh Amendment and Article III of the U.S. Constitution by denying its right to a jury trial in an Article III court.
Senate Confirms Commissioners Swett and LaCerte to Fill Remaining FERC Seats
On October 7, 2025, the U.S. Senate confirmed the nominations of Laura V. Swett and David A. LaCerte as FERC Commissioners. Once they are sworn in as Commissioners, they will fill the remaining two seats on the five-member Commission. Commissioner Swett’s term ends on June 30, 2030, and she will occupy the seat last held by former Chairman Mark Christie. Commissioner Swett has also been nominated to replace current Chairman David Rosner as the Chair of the Commission.
FERC Sunsets 53 Regulations in Response to April Executive Order | JD Supra
On October 1, 2025, the Federal Energy Regulatory Commission issued a final rule revising 53 regulations to include conditional sunset provision in response to the April 2025 Executive Order titled “Zero-Based Regulatory Budgeting to Unleash American Energy.” FERC, along with nine other agencies, was required to establish one-year conditional sunset dates for outdated, redundant, or unused regulations, after which the regulations will cease to be effective and be removed from the Code of...
FERC Sunsets 53 Regulations in Response to April Executive Order
On October 1, 2025, the Federal Energy Regulatory Commission issued a final rule revising 53 regulations to include conditional sunset provision in response to the April 2025 Executive Order titled “Zero-Based Regulatory Budgeting to Unleash American Energy.” FERC, along with nine other agencies, was required to establish one-year conditional sunset dates for outdated, redundant, or unused regulations, after which the regulations will cease to be effective and be removed from the Code of...
Divided Panel of the D.C. Circuit Upholds FERC’s Interpretation of PURPA Size Limitations Based on “Send Out” Capacity | JD Supra
On September 9, 2025, the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) on remand from the U.S. Supreme Court upheld FERC’s order granting Broadview Solar, LLC’s (“Broadview”) hybrid solar and battery project qualifying facility (“QF”) status based on FERC’s interpretation of the Public Utility Regulatory Policies Act of 1978 (“PURPA”).
FERC Clears the Way for the California Independent System Operator’s Extended Day-Ahead Market | JD Supra
On August 29, 2025, FERC issued three orders accepting tariff revisions proposed by PacifiCorp and Portland General Electric (“PGE”) to enable both utility’s participation in the California Independent System Operator Corporation’s (“CAISO”) Extended Day-Ahead Market (“EDAM”) and accepting CAISO’s proposed tariff revisions which modify the EDAM’s allocation of congestion revenues.
FERC Clears the Way for the California Independent System Operator's Extended Day-Ahead Market
On August 29, 2025, FERC issued three orders accepting tariff revisions proposed by PacifiCorp and Portland General Electric (“PGE”) to enable both utility’s participation in the California Independent System Operator Corporation’s (“CAISO”) Extended Day-Ahead Market (“EDAM”) and accepting CAISO’s proposed tariff revisions which modify the EDAM’s allocation of congestion revenues.
Fifth Circuit Finds ANR Pipeline’s Tariff Does Not Require Simultaneous Delivery for Short-Notice Shipments | JD Supra
On May 22, 2025, the U.S. Court of Appeals for the Fifth Circuit (“Fifth Circuit”) addressed a dispute between ANR Pipeline Company (“ANR”) and FERC. The case centered on the interpretation of ANR’s tariff and whether it required shippers to deliver and take gas simultaneously, even for short-notice shipments. The Fifth Circuit denied ANR Pipeline Company’s petition for review, affirming FERC’s decision that ANR’s tariff did not require simultaneous delivery for short-notice shipments.
FERC Accepts SPP’s Revised High Priority Transmission Study Planning Process | JD Supra
On May 14, 2025, FERC accepted Southwest Power Pool, Inc.’s (“SPP”) proposed revisions to its Open Access Transmission Tariff (“OATT”) to modify its high priority transmission study planning process. SPP argued these changes will allow transmission studies to better address transmission issues identified by stakeholders by expanding the scope of such studies to allow for considerations beyond economic benefits and costs, such as short-circuit and dynamic stability.
FERC Enforces “Rule of Reason,” Requiring CAISO to Embed Business Practice Manual Provision in Tariff | JD Supra
On April 29, 2025, FERC partially granted rehearing in the case of Cometa Energia, S.A. de C.V. (“Saavi”) against the California Independent System Operator Corporation (“CAISO”), finding a provision of CAISO’s Business Practice Manual for Reliability Requirements (“Business Practice Manual”) must be included in CAISO’s tariff under the “rule of reason,” as the provision significantly impacts rates and services.
FERC Again Rejects Co-Located Load Increase Proposal at Nuclear Facility | JD Supra
On April 10, 2025, FERC addressed arguments on rehearing that clarified, but did not modify the outcome of, a November 1, 2024, order (“Rejection Order”) rejecting PJM Interconnection, L.L.C.’s (“PJM”) proposal to increase the co-located data center load at a Susquehanna Nuclear, LLC (“Susquehanna”) nuclear generating facility. FERC again found that PJM’s amended Interconnection Service Agreement’s (“ISA”) non-conforming provisions were not necessary deviations from the pro forma ISA.
FERC Grants and Denies in Part Basin Electric’s Transmission Incentive Petition | JD Supra
On March 31, 2025, FERC granted in part and denied in part Basin Electric Power Cooperative’s (Basin Electric) petition for declaratory order seeking transmission incentives for the Roundup-Kummer Ridge Project, the Tande-Finstad-Leland Olds Project (LOS-Tande Project), and the NE Williston-Folvag 115 kV-Judson-East Fork-Tande Project (Springbrook Project) (collectively, “Projects”).
FERC Denies Complaint Over $23 Million in Network Upgrade Costs | JD Supra
On March 20, 2025, FERC denied Ponderosa Power, LLC’s (“Ponderosa”) complaint alleging that NorthWestern Corporation’s (“NorthWestern”) application of its large generator interconnection procedures (“LGIP”) was unjust and unreasonable or unduly discriminatory or preferential.
FERC Grants BP Energy’s Complaint Appealing CAISO Meter Data Reporting Penalty | JD Supra
On February 27, 2025, FERC granted a complaint filed by BP Energy Retail Company California LLC (“BP Energy” or “Company”) under sections 206 and 306 of the Federal Power Act appealing a penalty the California Independent System Operator Corporation (“CAISO”) assessed against BP Energy under a section of CAISO’s Open Access Transmission Tariff (“OATT”) requiring scheduling coordinators to timely submit certain meter data.
FERC Grants BP Energy’s Complaint Appealing CAISO Meter Data Reporting Penalty
On February 27, 2025, FERC granted a complaint filed by BP Energy Retail Company California LLC (“BP Energy” or “Company”) under sections 206 and 306 of the Federal Power Act appealing a penalty the California Independent System Operator Corporation (“CAISO”) assessed against BP Energy under a section of CAISO’s Open Access Transmission Tariff (“OATT”) requiring scheduling coordinators to timely submit certain meter data.
FERC Institutes Show Cause Proceeding on Co-Location Issues in PJM
On February 20, 2025, FERC found that the PJM Interconnection, L.L.C. (“PJM”) Open Access Transmission Tariff (“OATT”) appears to be unjust and unreasonable because it does not address with clarity or consistency the rates, terms, and conditions of service that apply to co-location arrangements and therefore directed PJM to show cause as to why the OATT, the Amended and Restated Operating Agreement of PJM, and Reliability Assurance Agreement Among Load Serving Entities in the PJM region...
FERC Withdraws Draft GHG Policy Statement and Terminates Associated Proceeding | JD Supra
On January 24, 2025, FERC withdrew its 2022 draft Greenhouse Gas (“GHG”) Policy Statement and terminated the associated proceeding. FERC determined that, after reviewing the entire record, issues concerning GHG emissions are better analyzed on a case-by-case basis when raised by parties in proceedings.
FERC Rejects Basin’s Special Rate for Crypto and Large Load Customers, Sparking Further Interest in “Large Load” Policy Discussions at FERC | JD Supra
On August 20, 2024, the Federal Energy Regulatory Commission (“FERC”) issued an order rejecting, without prejudice, a contested proposal from Basin Electric Power Cooperative (“Basin”) to establish special wholesale power sales rate schedules for cryptocurrency (“crypto”) operations and other new large loads.
FERC Rejects Basin’s Special Rate for Crypto and Large Load Customers, Sparking Further Interest in “Large Load” Policy Discussions at FERC
On August 20, 2024, the Federal Energy Regulatory Commission (“FERC”) issued an order rejecting, without prejudice, a contested proposal from Basin Electric Power Cooperative (“Basin”) to establish special wholesale power sales rate schedules for cryptocurrency (“crypto”) operations and other new large loads.
Court Vacates FERC “Soft” Cap Refund Order Issued After 2020 California Heat Wave | JD Supra
On July 9, 2024, the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) vacated orders issued by the FERC that required six wholesale power sellers (the “Sellers”) to issue refunds to customers for power sales made above FERC’s “soft” price cap during the 2020 heatwave in California.
David Rosner and Lindsay See Sworn in as FERC Commissioners; Allison Clements’ Term Expires | JD Supra
David Rosner and Lindsay See have been sworn in as FERC’s newest Commissioners on June 13 and 28, 2024, respectively. The FERC Open Meeting on June 27 marked Commissioner Rosner’s first Open Meeting and Commissioner Allison Clements’ last Open Meeting before her term expired on June 30, 2024. The U.S. Senate now-current Commissioners Rosner and See on June 13, 2024, along with Judy Chang. It is likely that Judy Chang will be sworn in as Commissioner in the coming days.
David Rosner and Lindsay See Sworn in as FERC Commissioners; Allison Clements’ Term Expires
David Rosner and Lindsay See have been sworn in as FERC’s newest Commissioners on June 13 and 28, 2024, respectively. The FERC Open Meeting on June 27 marked Commissioner Rosner’s first Open Meeting and Commissioner Allison Clements’ last Open Meeting before her term expired on June 30, 2024. The U.S. Senate now-current Commissioners Rosner and See on June 13, 2024, along with Judy Chang. It is likely that Judy Chang will be sworn in as Commissioner in the coming days.
SCOTUS Overrules Chevron Deference in 6-3 Ruling | JD Supra
On June 28, 2024, the United States Supreme Court (“Supreme Court”) overruled its prior decision in Chevron U.S.A. v. Natural Resources Defense Council (“Chevron”) in a 6-3 vote in Loper Bright Enterprises et al. v. Raimondo, Secretary of Commerce, et al. (“Loper Bright”). The Chevron doctrine has required federal courts to defer to administrative agencies’ interpretations of statutes the agency administers when the underlying statute is ambiguous.
Show More
loading
Actions
Is this you?
As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.Get in touch with Jill
Contact Jill, search articles and posts on X, monitor coverage, and track replies from one place.
Learn more about Muck Rack