With the increasing uncertainty and complexity of industrial production, dynamic events are inevitably happened during the production process. This paper deals with the transportation time constrained dynamic flexible job shop scheduling problem with machine breakdown, new jobs arrival, jobs cancellation, and processing time change of operations. Considering the actual production situation, a makespan rescheduling model based on transportation time is established.