Is this you? As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.
Claim your profile
Get in touch with Jianying
Contact Jianying, search articles and posts on X, monitor coverage, and track replies from one place.
Learn more about Muck RackActions
Is this you?
As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.Articles
Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario
1. Introduction Tunnel construction is a critical component of railway engineering, with its quality and efficiency directly affecting the safety and reliability of the entire railway system [1]. Tunnel construction delays can cost millions in railway and urban infrastructure projects. Due to complex geological conditions, advanced technical requirements, and stringent schedule and cost control, tunnel engineering remains a significant challenge.
Optimization of Tunnel Construction Schedule Considering Soft Logic
All articles published by MDPI are made immediately available worldwide under an open access license. No special permission is required to reuse all or part of the article published by MDPI, including figures and tables. For articles published under an open access Creative Common CC BY license, any part of the article may be reused without permission provided that the original article is clearly cited. For more information, please refer to https://www.mdpi.com/openaccess.
Actions
Is this you?
As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.Get in touch with Jianying
Contact Jianying, search articles and posts on X, monitor coverage, and track replies from one place.
Learn more about Muck Rack