In mid-April of 2021, Metro Detroit saw three days of solid rain. The roof of a new hotel project was in place, and thought to be water tight, but was unable to stand against the volume of water being dumped on it. The result: a hotel in mid-construction with water damage from top to bottom, affecting all 158 rooms. Ninety-percent of the water was hidden. This is where the story gets interesting. This hotel was built off site, in pods, and shipped to Michigan to be assembled on site.