This version is not peer-reviewed. Pooja Basnet,Pramen P. Shrestha * Pooja Basnet,Pramen P. Shrestha * Submitted: 19 October 2026 You are already at the latest version Public-private partnerships (P3s) have become an increasingly adopted delivery method for major U.S. highway infrastructure, with Value for Money (VfM) analysis serving as the primary analytical basis for procurement decisions.
Is this you? As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.
Claim your profile
Articles by Pramen P Shrestha
Performance Comparison of Lump-Sum Design-Build (DB) and Progressive Design-Build (PDB) Methods in Infrastructure Projects
Submitted: 15 September 2026 Posted: 16 September 2026 You are already at the latest version Progressive Design-Build (PDB) differs from traditional lump-sum Design-Build (DB) by allowing project design, scope, and cost to be progressively developed before the final construction price is established. However, empirical comparisons of these two delivery methods across infrastructure sectors remain limited.
Principal Component Analysis: Critical Success Factors Affecting Progressive Design-Build (PDB) Project Performance
Submitted: 14 September 2026 Posted: 15 September 2026 You are already at the latest version Progressive Design-Build (PDB) has gained increasing attention as an alternative project delivery method that promotes early collaboration between owners and design-builders. However, limited empirical research has systematically identified the factors that are critical to successful PDB project delivery.
Practitioners' Perspective on Value for Money (VfM) Analysis
Submitted: 11 September 2026 Posted: 14 September 2026 You are already at the latest version Value for Money (VfM) analysis is the primary mechanism by which U.S. state agencies evaluate whether a project should be delivered through a public-private partnership (P3) or conventional public procurement. While the methodology has been widely applied, relatively little is known about how practitioners conduct these analyses and apply VfM in practice.
Evaluating Life-Cycle Unit Costs of Traditional Cement Concrete and New Polymer Concrete Manholes in Wastewater Systems
1. Introduction Manholes are an important component of wastewater sewer systems since they provide direct access to the sewer system [1]. While performing a condition assessment, professionals identify the system’s current state and whether it is time for maintenance and repairs or replacement to keep the system safe. A manhole is often located where two or more sewer lines converge or where the inclination or direction of a sewer line changes.
Buildings | Free Full-Text | Project Performance Comparison of Public-Private Partnership (P3) Highway Projects against Design Build (DB) and Design Bid Build (DBB) Highway Projects
1. Introduction Public–private partnerships (P3s) have gained prominence in both developed and developing nations over recent decades [1]. The rise in popularity is primarily due to the recognized advantages of P3s in the delivery of public infrastructure projects [2]. The increasing interest in P3 projects, both in developed and developing nations, is driven by their ability to access new financing sources and shift particular project risks to private agencies.
Show More
loading
Actions
Is this you?
As a journalist, you can create a free Muck Rack account to customize your profile, list your contact preferences, and upload a portfolio of your best work.Get in touch with Pramen P
Contact Pramen P, search articles and posts on X, monitor coverage, and track replies from one place.
Learn more about Muck Rack